Evaluation Of Eddy Current Condenser Tube Inspection Practice In Khartoum North Power Station
Kamal NasrEldin Abdalla, Zuhier Mohammed Elshiekh Daffaallah
جامعة الخرطوم, كلية الهندسة-جامعة الخرطوم · السودان
الموضوعات
علوم تطبيقية وتكنولوجية
الملخص
The main objectives of the study was to measure the success achieved by the waythe Eddy Current Inspection Method was applied to the steam turbine condensertubes of Khartoum North Power Station (KNPS), and to analyze the inspectionresult to recommend the optimum way of implementation. Adoption of thismethod was necessitated by the frequent condenser tube failure incidents thatresulted in high generation losses and unplanned maintenance hours.Consequently, KNPS outage statistics were analyzed to measure theimprovement achieved by the adopted approach. Next, an alternative approachwas applied. Results of Unit 2 and Unit 1 condenser eddy current tube inspectionwere re-analyzed find the failure pattern which, in turn, was compared to find theexpected failure pattern. Expected failure mechanisms was deduced by studyingthe factors that affect the life span of condenser tubes related to condenser design,maintenance practices and chemical treatment of water. Finally, the twoapproaches were compared and optimum practice recommended
روابط وملفات
التعريف والنوع
- رقم الوثيقة
- fc626a32-19cb-43d5-aece-60483c61a9a2
- رقم العقد
- 0
- نوع الوسائط
- Crawler
- نوع المحتوى
- الرسائل العلمية
- صيغة المصدر
- رسائل ماجيستير
- نوع الملف
- pdf text
- أسماء الملفات
- 1636788_1.pdf
بيانات النشر
- ألقاب المؤلفين
- [{"name_ar":" Kamal NasrEldin Abdalla","title_ar":"اشراف","title_en":"Supervision"},{"name_ar":"Zuhier Mohammed Elshiekh Daffaallah","title_ar":"اعداد","title_en":"Preparation"}]
- اللغة
- English
المصدر والدورية
- اسم المصدر
- Evaluation Of Eddy Current Condenser Tube Inspection Practice In Khartoum North Power Station
المحتوى والصفحات
- عدد الصفحات
- 0
إشراف وإعداد
- الإشراف
- Kamal NasrEldin Abdalla
- الإعداد
- Zuhier Mohammed Elshiekh Daffaallah
الاقتباسات الببليوغرافية
APA
MLA