NLP-Based Comparative Assessment of Clauses Quantifying Risk Transfer in Construction Contracts
Hoda Mohamed Elshamy, May Haggag
كلية العلوم والهندسة-الجامعة الأمريكية بالقاهرة · مصر
الموضوعات
علوم تطبيقية وتكنولوجية
الملخص
Employers in the construction industry mostly deviate from standard contract forms such as FIDIC and NEC, by introducing alterations to the contract conditions that shift a great portion of risks from the client to the contractor. Originally, these risks were distributed more equitably between all contracting parties in the standards forms. The imbalances in the contractual conditions create fertile ground for conflicts, and if not resolved, will escalate to disputes during the project execution phase, leading to significant cost overruns and time delays. The contractors, therefore, attempt to restore the original balance through making amendments to the communicated contract, through changing the high-risk contractual clauses and negotiating the proposed amendments with the employer. As such, effective contract management at early project stage is crucial for project’s success, therefore, this work developed a hybrid NLP and semantic analysis comparative framework, through integrating pre-trained machine learning models with pattern-matching techniques to support the contractors during tendering stage. The developed framework is designed to compare the two versions of clauses, the employer’s original and the contractor’s amended version, to quantify the extent of risk reallocation back to the employer through the clause’s revisions. The model was developed and implemented on dataset including a total of 704 clauses pairs, originally collected from a contracting company projects executed from the period of 2020-2025, and the findings revealed that, for the analyzed data, the contractor succeeded in reducing his exposure to risk by approximately 43% through the amendments made. This developed framework offers a practical decision-support tool for the contractor’s decision makers during early negotiation phase, prior to contract signature to promote a more balanced contractual outcomes and eventually reduce the potential of future disputes.
روابط وملفات
التعريف والنوع
- رقم الوثيقة
- f5867b92-532b-4caf-ad1f-65a6dcb1d2d7
- رقم العقد
- 0
- نوع الوسائط
- Crawler
- نوع المحتوى
- الرسائل العلمية
- صيغة المصدر
- رسائل ماجيستير
- نوع الملف
- pdf text
- أسماء الملفات
- 1084945_2.pdf
بيانات النشر
- ألقاب المؤلفين
- [{"name_ar":"Hoda Mohamed Elshamy","title_ar":"اعداد","title_en":"Preparation"},{"name_ar":"May Haggag","title_ar":"اشراف","title_en":"Supervision"}]
- اللغة
- English
المصدر والدورية
- اسم المصدر
- NLP-Based Comparative Assessment of Clauses Quantifying Risk Transfer in Construction Contracts
المحتوى والصفحات
- عدد الصفحات
- 0
- كلمات الباحثين
- Construction Contracts, Contractual Risk Allocation, FIDIC Contracts, Natural Language Processing, Construction Contract Management, Semantic Analysis.
إشراف وإعداد
- الإشراف
- May Haggag
- الإعداد
- Hoda Mohamed Elshamy
الاقتباسات الببليوغرافية
APA
MLA