Reconstruction of Mixer Crane Capacity 50/10 tons , Span 22.25 Neters
اعادة انشاء رافعة مولفة سعة من 50 ل 100 طن ، المدى 25و22 متر
زكريا جاد حسنين
معهد التبين للدراسات المعدنية · مصر
الموضوعات
علوم بحتة وطبيعية
العلوم التطبيقية والتكنولوجيا › الهندسة الكيميائية › التعدين › التعدين المعدنى
الملخص
Final results : Mixer over head crane 50 / 10 ton span 22 , 25 m - Modifications : Main hoist - reducer - using of materials of less hb which is available in the plant (p . 65 , 72 a , 92 a , 96) - no changes in the centre distances of the reducer - same roller bearings - all parameters of the gears are changed (m , dp , z) - the same speed ratio - Drum : drum bearing modifications by using antifriction bearings - carriage : according to the calculation end switch will be less propability of using brake due to adhesion - Auxiliary hoist : Redueer : using materials of less hb which is available in the plant (p 36 , 40 , 56) - All parameters and shafts are the same - Carriage : According to the calculation ends witch will be installed (see chapter 3 , 3 - 4 P 52) - less propability of using brake due to adhesion - Travelling mechanism of trolley : Reducer : Using materials of less HB which is available in the plant (P 107 , 111) - All parameters of gears and shafts are the same - Longitudinal motion : According to the calculation end switch will be installed (see chapter 6 , 6 - 4 , P . 102) - Experimental tes : The test show that it is necessary to make a grinding for gears hoisting reducers to avoid the vibration and the dynamic loads in the main shaft of hoisting Mechanism (P . 152) - Safety engineering : All safety rules for overhesd crane are taken according to the norms (see chapter 9 , P . 136) .
روابط وملفات
التعريف والنوع
- رقم الوثيقة
- 10134
- رقم المصدر
- 122134
- رمز المصدر
- BK00010134-001
- رقم العقد
- 340
- نوع الوسائط
- AskZad
- نوع المحتوى
- الرسائل العلمية
- صيغة المصدر
- رسائل ماجيستير
- نوع الملف
- ورقي
- أسماء الملفات
- 11221340001.pdf
بيانات النشر
- ترجمة العنوان
- اعادة انشاء رافعة مولفة سعة من 50 ل 100 طن ، المدى 25و22 متر
- ألقاب المؤلفين
- [{"name_ar":"Arakelian","name_en":"Arakelian","title_ar":"اشراف","title_en":"Supervision"},{"name_ar":"زكريا جاد حسنين","name_en":"Zakaria Gad Hasanien","title_ar":"مؤلف","title_en":"Author"}]
- اللغة
- Arabic
المصدر والدورية
- اسم المصدر
- Reconstruction of Mixer Crane Capacity 50/10 tons , Span 22.25 Neters
المحتوى والصفحات
- عدد الصفحات
- 249
- رقم الجزء
- 0
- أبعاد الوثيقة
- 22 × 30
- الموضوعات الرئيسية
- العلوم التطبيقية والتكنولوجيا › الهندسة الكيميائية › التعدين › التعدين المعدنى
- كلمات مفتاحية
- التعدين المعدنى
- التصنيف العام
- متخصص
إشراف وإعداد
- الإشراف
- Arakelian
جدول المحتويات
TASK 0 Introduction 0 Chapter : 1 Design Procedure 1 General 2 Desing paraneters and trends 5 Design loads 6 Allowable stresses 9 Chapter : 2 Auxiliary Hoisting Neehanism 15 Auxiliary hoisting mech characteristies 16 Drum F . P . M 16 Selection of motor 17 Starting characteristies 19 Braking characteristies 20 Coupling between motor and reducer 21 Reducer checking of teeth strength 22 a - Surface endurance stress 23 b - Beak surface stress 27 c - Bending endurance stress 28 d - Bealk bending stress 30 Final results and canelsions 36 Check calculation of shafts 38 Final results for shafts and canelusion 40 Chapter 3 : Auxiliary Hoist Short Travelling Nechanism 41 Selection of wheel size 42 Selection of moter 47 Starting characteristics 50 Braking 52 Dus to adhesion 52 Without brake 53 Design loads 54 Rodueer 55 Driving shafts and check calculation 55 wheel axles 55 Final results for driving shafts and conclusion 56 Chapter : 4 Short Travelling Nechanism of Hain Hoisting 56 Selection of wheel size 57 Selection of moter 59 Starting characteristics 60 Braking characteristies 62 Dus to adhesion (deceleration) 62 without brake 62 Design loads 63 Rodueer 64 Travelling shafts and check calculation 64 wheel axles 64 Final results for driving shafts and conclusion 65 Check of teeth strength 66 Final results for gears and conclusion 72 Chapter : 5 : Hain Hoisting Nechanism 74 Speed ratio of main reducer 76 Wire rope 77 Checking of drum 81 Selection of motors 82 Starting characteristics 83 Working one motor 83 working two motors 84 Braking characteristics 85 During lifting 85 During lowering 86 Coupling between moter and reducer 86 Reducer 88 Check of teeth strength 88 Surface endurance stress 88 Beak surface stress 89 Bending endurance stress 90 Beak bending stress 92 Final results for gears and conclusion 92 Driving shafts and check calculation 94 Fatigue calculation of main shafts 96 Final results for shats and canelusion 96 Chapter 6 : Crane Travelling Nechanism 97 Selection of wheel size 98 Selection of moter 100 Starting characteristics 101 Braking 102 Due to adhesion 102 Without brake 103 Design loads 104 Rodueer 106 Check of travelling shafts and axles 106 Final results for shafts and conclusion 107 Check of teeth strength 108 a - Surface endurance stress 108 b - Bending endurance stress 108 c - Beak bending stress 109 Final results for gears and conclusion 111 Chapter : 7 Boarings 112 Chapter 8 : Modernization 126 Main hoist short travelling mechanism 127 Main hoist mechanism 132 Chapter 9 : Safety Engineering 136 Chapter 10 : Economical study 145 Chapter 11 : Experidntal Test 152 Bibliography 165 Final Neluts 163
الاقتباسات الببليوغرافية
APA
MLA