رسائل ماجيستير الانجليزية 2016 0a8ecc8b-2ea7-437a-b3d4-d3326cd8b7f1

Substantial Completion/ Practical Completion in Construction Contracts

الإنجاز الإجمالي/ الإنجاز العملي في عقود الإنشاء

Abba Kolo, Moez Nasser

كلية إدارة الأعمال والقانون-الجامعة البريطانية في دبي · الامارات

الموضوعات

قانون

الملخص

This dissertation examines the issue of Substantial Completion/Practical Completion (SC/PC) which is considered to be one of the most important Project Milestone provisions that is contained in most Forms of Construction Contracts invoking tangible benefits to both contracting parties notwithstanding the ambiguous nature of the term that often give rise to disputes.The purpose of this dissertation is to bring about an awareness of the significance and important nature of SC/PC as contained in Standard forms of construction contract and due to its importance, how such a provision is misinterpreted by the contracting parties and the party on which decision making powers are conferred. The source of misinterpretation stems from lack of clearly defined terms. This has led to judicial processes at all levels, and numerous discussions amongst Industry Professionals. The matter has long been debated in the Construction Industry and the Law in certain jurisdictions has attempted to define the terms but with a mixed approach as will be seen later on in this Paper.Decisions of the Courts, in some circumstances, have been such that have given rise to discussions and mixed arguments amongst many commentators. The evidence indicate that there is widespread perception amongst Industry Professionals of injustice arising out of ambiguities that exist in Construction contracts concerning SC/PC and the need for clearly defining its meaning becomes more and more pronounced.This research paper therefore encompasses reasoned arguments regarding the need for contracting parties to be aware of the risks involved with unclear defined terms. It also highlights the texts within the contract that is prone to misinterpretation and provides an insight for further research for enhancement of Standard Forms of Contract commonly in use within the industry.It is hoped that this dissertation will provide Industry Professionals a deeper awareness towards the importance of SC/PC as applied in Construction Contracts and perhaps provoke a need for further dialogue and research with the aim of eliminating ambiguities by providing clarity of the term when entering into contracts which otherwise has proved to have an adversarial effect amongst the contracting parties both in contract and the Law.

التعريف والنوع

رقم الوثيقة
0a8ecc8b-2ea7-437a-b3d4-d3326cd8b7f1
رقم العقد
0
نوع الوسائط
Crawler
نوع المحتوى
الرسائل العلمية
صيغة المصدر
رسائل ماجيستير
نوع الملف
pdf text
أسماء الملفات
8258_1.pdf

بيانات النشر

ترجمة العنوان
الإنجاز الإجمالي/ الإنجاز العملي في عقود الإنشاء
ألقاب المؤلفين
[{"name_ar":" Abba Kolo","title_ar":"اشراف","title_en":"Supervision"},{"name_ar":"Moez Nasser","title_ar":"اعداد","title_en":"Preparation"}]
اللغة
English

المصدر والدورية

اسم المصدر
Substantial Completion/ Practical Completion in Construction Contracts

المحتوى والصفحات

عدد الصفحات
0

إشراف وإعداد

الإشراف
Abba Kolo
الإعداد
Moez Nasser

الاقتباسات الببليوغرافية

APA

Abba Kolo و Moez Nasser. (2016). Substantial Completion/ Practical Completion in Construction Contracts. أطروحة(رسائل ماجيستير). كلية إدارة الأعمال والقانون-الجامعة البريطانية في دبي. الامارات .

MLA

Abba Kolo و Moez Nasser. Substantial Completion/ Practical Completion in Construction Contracts. 2016. كلية إدارة الأعمال والقانون-الجامعة البريطانية في دبي، رسائل ماجيستير.