Effect of Roseires Dam Heightening on Thrust Bearing of the Power Generation Units
أثر تعلية خزان الرصيرص على كراسي إسناد وحدات محطة توليد الكهربا
علي سيوري, محمد عبدالكريم هارون
كلية الدراسات العليا-جامعة السودان للعلوم والتكنولوجيا · السودان
الموضوعات
علوم تطبيقية وتكنولوجية
الملخص
After more than forty years without any apparent problems on their com-bined guide and thrust bearings, the seven 40 MW hydro-generators of RO-SERIS Hydroelectric Power Plant were failing. The source of the failure (which happened after heightening the dam from 40 m to 50 m) was the over heat of the thrust bearing pads. This caused considerable losses of power with high costs. The solution proposed by the operation engineers was operating the thrust bearing high pressure pumps (In case of any prob-lems with hydrodynamic lubrication- insufficient load carrying capacity- the hydrostatic jacking system been used permanently in order to increase reliability of the bearing). The direct cost was estimated to be SD 5,000,000,000 (Pumps operating and power losses).
روابط وملفات
التعريف والنوع
- رقم الوثيقة
- 00ff581e-4e80-4329-862d-02398b224c89
- رقم العقد
- 0
- نوع الوسائط
- Crawler
- نوع المحتوى
- الرسائل العلمية
- صيغة المصدر
- رسائل ماجيستير
- نوع الملف
- pdf text
- أسماء الملفات
- 17365_1.pdf
بيانات النشر
- ترجمة العنوان
- أثر تعلية خزان الرصيرص على كراسي إسناد وحدات محطة توليد الكهربا
- ألقاب المؤلفين
- [{"name_ar":"علي سيوري","title_ar":"اشراف","title_en":"Supervision"},{"name_ar":"محمد عبدالكريم هارون","title_ar":"اعداد","title_en":"Preparation"}]
- اللغة
- English
المصدر والدورية
- اسم المصدر
- Effect of Roseires Dam Heightening on Thrust Bearing of the Power Generation Units
المحتوى والصفحات
- عدد الصفحات
- 0
إشراف وإعداد
- الإشراف
- علي سيوري
- الإعداد
- محمد عبدالكريم هارون
الاقتباسات الببليوغرافية
APA
MLA