Upgrading of Earthing System for Kilo-10 Substation
ترقية نظام التأريض لمحطة كيلو عشرة التحويلية
Mohammed Osman Hassan, Murtada Adam Abdurrahman Ibrahim
كلية الدراسات العليا-جامعة السودان للعلوم والتكنولوجيا · السودان
الموضوعات
علوم تطبيقية وتكنولوجية
الملخص
This project aims to Upgrading of Earthing System for Kilo-x Substation,Components starting from the current transformers, voltage transformers, power transformers, lightning arresters, circuit breakers and bus-bar arrangement.The project also provides ground grid system by using ETAP software program because it is easy to Upgrading and calculate the step potential, the touch potential, the total length of Earthing mat conductors, the size of Earthing mat conductors and the total number of Earthing rod in order to reach the best possible Upgrading of Earthing System for Kilo-x Substation. Kilo-X substation was implemented as the study case, from simulation results obtained, there is a difference between the existing ground design scheme and that obtained with ETAP.
روابط وملفات
التعريف والنوع
- رقم الوثيقة
- 00a49b47-36ba-4d7b-81e2-21a7936a8f72
- رقم العقد
- 0
- نوع الوسائط
- Crawler
- نوع المحتوى
- الرسائل العلمية
- صيغة المصدر
- رسائل ماجيستير
- نوع الملف
- pdf text
- أسماء الملفات
- 21467_1.pdf
بيانات النشر
- ترجمة العنوان
- ترقية نظام التأريض لمحطة كيلو عشرة التحويلية
- ألقاب المؤلفين
- [{"name_ar":"Mohammed Osman Hassan","title_ar":"اشراف","title_en":"Supervision"},{"name_ar":"Murtada Adam Abdurrahman Ibrahim","title_ar":"اعداد","title_en":"Preparation"}]
- اللغة
- English
المصدر والدورية
- اسم المصدر
- Upgrading of Earthing System for Kilo-10 Substation
المحتوى والصفحات
- عدد الصفحات
- 0
إشراف وإعداد
- الإشراف
- Mohammed Osman Hassan
- الإعداد
- Murtada Adam Abdurrahman Ibrahim
الاقتباسات الببليوغرافية
APA
MLA